The Entrances to the Building B Lobby and to the Garage are Often Open

Severity:
Important - greatly affects quality of life
Status:
In progress - the administration acknowledges the issue and is working on it
Problem Description:


The Property Manager says that he will have it checked. Indeed, there was a break at the main door of our building last week, and it was promptly repaired. Moreover, just like in building A where the doors were replaced, there should be a renovation of our entry doors, but he did not provide a specific date. He will also check the garage access doors that are not locked and address the issue.

Risks:

Unauthorized individuals can enter the garage and the building, creating a risk of theft, vandalism, or other mischief.

Next steps:
  • The committee will check with the tenants to see if they observe that the doors are indeed closed as they should be.
  • The Property Manager must verify that all garage doors are locked.
Follow-ups

The door to S1 near the garage entrance (not far from the pool) is not locked.

The door to S2 is not locked.

Next meeting

Monday 9th of September 2024 at 7 PM

In the hall of building C

(next to the stores)

Contact

Have a question? An incident, photo or opinion for the website? An exchange with the administration to share? Write to us at:

clr-rtc@googlegroups.com

Register with us here!

The Collective

Affected by the deterioration of the Rockhill Apartments in Montreal, some tenants began meeting in July 2023 to consider ways to address the situation.

From these meetings emerged the Rockhill Tenants Collective, a spontaneous group dedicated to upholding the rights of residents and the heritage value of this once upscale and avant-garde complex.